Document Type : Research Paper

Authors

1 university of tehran

2 university

3 MSc, Sport Management Department, Faculty of Physical Education, Tehran University, Tehran,

Abstract

The aim of this study is designing the performance assessment model for sports complex building projects contractors. The method is practical of the correlation-descriptive type. In this study the effective parameters on the performance of sports complex building contractors were identified based on the dimensions of the balanced scorecard (financial section, costumer section, internal affairs, learning and growth), through library research and Delphi method. In the second stage, in order to gather data from experts (sports complex building projects contractors), field research was utilized. Then, the weight of each criterion (balanced scorecard dimension) was determined using the FAHP method based on the viewpoint of the construction managers and experts and sports complex building projects contractors, and was considered to be the input for the Fuzzy VIKOR method. Finally, using the fuzzy VIKOR method and implementation in MATLAB software, the weight for each factor was determined. The results of the factor weight determination and the prioritizing of effective factors shows that among the factors, skill and adequate knowledge in estimating the actual cost in the initial contract, contractor previous experience and performance, making use of an expert technical force, abiding by quality and technical principals, using up to date tools and facilities in the project, were ranked one to five.

Keywords

Main Subjects

  1. Borne, M., Borne, P. (2002). Balanced scorecard (H. Taghavi. Trans). Tehran: Rasa (Persian).
  2. Chen, L. Y., & Wang, T-Ch (2009). Optimizing partner Choice in IS/IT outsourcing projects: The strategic decision of fuzzy VIKOR, International Journal of Production Econimics, 120(1), 233-242.
  3. Geahchi, S., & Akhbare, M. (2017). The economic justification of the project for the construction and operation of the sports complex of the sauna and the pool. Paper presented at the Third Annual Conference on Architecture, Urban Planning and Urban Management. The Architectural and Urban Design Institute of the Safiran Road Mehrazi, (Persian).
  4. Gholami Torkslouyeh, S., & Mehdi Pour, Asmasha, T. (2015). Evaluation of the health and safety of multi-purpose gyms and its relationship with the occurrence of injuries. Applied research in sports management. 4(14), 23-34. (Persian).
  5. Güngör, Z., SerhadlıoÄŸlu, G., & Kesen, S. E. (2009). A Fuzzy AHP approach to personnel selection problem. Applied Soft Computing, 9(2), 641-646.
  6. Hesham, A., Remon, F., & Enas, S. (2018). Identification of construction subcontractor prequalification evaluation criteria and their impacton project success. Alexandria Engineering Journal, 18(4), 83-92.
  7. Higgs, G., Mitch, L., & Paul, (2015). Accessibility to sport facilities in Wales: A GIS-based analysis of socioeconomic variations in provision, Geoforum,
    62, 105-120.
  8. Huang, Y., & Yan, Y. (2008). Reaserch of evaluating credit-risk in powerenterprise based on SVM and VIKOR method. Paper presented at the IEEE International Conference on Industrial Engineering and Engineering Management, Singapore.
  9. Junior, F. R., Osiro, L., & Carpinetti, L. C. (2014). A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Applied Soft Computing, 31(21), 194-209.
  10. Khosravani, M. (2011). Dispute resolution management in the design of a sports complex. Paper presented at the Seventh International Project Management Conference, Iran Project Management Association, Tehran. (Persian).
  11. Liao, H., & Xu, Z. (2013). A VIKOR-based method for hesitant fuzzy multi-criteria decision making. Fuzzy Optimization and Decision Making, 12(4),
    373-392.
  12. Liu, J. H., & Chuang, Y-T. (2010). Developing a hybrid multi-criteria model forselection of outsourcing providers. Expert Systems with Applications,
    37, 3755-3761.
  13. Molanori, M., Molanouri Shamsi, M., & Ganjanian, H. (2016). Choosing the best place to build an exercise complex using the ANP Model (Case Study: Central Yazd Division). Journal of Sport Management, 34, 777-795. (Persian).
  14. Naji Azarpour, S., & Teimuri, A. (2018). Evaluation and selection of contractor in construction projects with the supply chain management approach and using the PROM the method E. Sharif Journal of Industrial Engineering and Management, 1, 29-37. (Persian).
  15. Nicole, S. N., Yiua, D. W. M., & Chana, N. N. (2019). Implementation of safety management system in managing constructionprojects: Benefits and obstacles. Safety Science, 117, 23-32.
  16. Parhisghar, M. (2011). Presentation of balanced scorecard performance indicators. Scientific Journal, 9(2), 12-18. (Persian).
  17. Sabt, M., Adli, A., & Nagash Toosi, H. (2017). An integrated framework for project performance evaluation from the viewpoint of manufacturing industry contractors. Sharif Civil Engineering (Sharif Civil Engineering), 33(4), 83-95. (Persian).
  18. Sanayei, A., Farid Mousavi, S., & Yazdankhah, A. (2010). Group decision making process for supplier selection with VIKOR under fuzzy environment. Expert Systems with Applications, 37(1), 24-30.
  19. Wang, A., Ma, M., Wu, G., Liu, Y., Gong, Zh., & Xiaoyan, Ch. (2019). Conflicts concerning construction projects under the challenge of cleaner production: Case study on government funded projects. Journal of Cleaner Production.
    225, 664-674.
  20. Yang, Y.P., Shieh, H-M., & Tzeng, G-H (2013). A VIKOR techniquebased on DEMATEL and ANP for information security risk control assessment. Information Sciences, 232, 482–500.